
The length of the elevated section of Route I81 that runs through the middle of Syracuse.
The length of the elevated section of Route I81 that runs through the middle of Syracuse.
Tags:2012, Connective Corridor, Construction, I81 Challenge, Neighborhood in Transition, Numbers, Syracuse, Syracuse Demographics, Transportation
Posted in Business, Politics | No Comments »
Connective Corridor revitalization (cost estimate)
Tags:2012, Connective Corridor, Construction, Data Consumption, Neighborhood in Transition, Numbers, Syracuse Demographics
Posted in Business | No Comments »
Syracuse in focus (SIF) is proudly powered by WordPress
Entries (RSS) and Comments (RSS).