Posts Tagged ‘Neighborhood in Transition’
Wednesday, September 11th, 2013
Here’s a short video from today’s Sept. 11 Ceremony at Forman Park. Last year the event was held in Firefighter’s Park a few blocks away.
Tags:2013, 9/11, Central New York Police Retirees Association, Connective Corridor, East Genesee Street, Forman Park, Memorial, Midtown, Neighborhood in Transition
Posted in Media | No Comments »
Thursday, September 5th, 2013
Midtown Syracuse (circa 1990)
Here’s a look at the old Midtown Plaza (where the Center of Excellence now stands) and the surrounding bungalows of the former Kennedy Square complex.
Tags:2013, Connective Corridor, East Fayette Street, Kennedy Square, Midtown, Midtown Plaza, Neighborhood in Transition, New urbanism, Syracuse, Syracuse Center of Excellence (Syracuse CoE), Throwback Thursday
Posted in Photography | No Comments »
Monday, August 19th, 2013
Here’s part two of our conversation with Linda Dickerson-Hartsock, director of the Connective Corridor. She talks about the Corridor as a social network and destination as much as a transportation route. It has literally connected some neighborhoods a stop at a time.
Under her leadership the route has the potential to become that third space (as in that place between work and home) here in the city.
Tags:2013, CENTRO, Connective Corridor, Linda Dickerson Hartsock, Midtown, Neighborhood in Transition, New urbanism, SIF Conversations, Syracuse, Transportation
Posted in Business | No Comments »
Wednesday, March 6th, 2013
New signs (designed by Syracuse students) now dot the Connective Corridor Bus Route.
Tags:2013, Art, Business, CENTRO, Connective Corridor, design, Neighborhood in Transition, Syracuse, Transportation
Posted in Art | No Comments »
Friday, January 25th, 2013
Syracuse Arborist Steve Harris discusses plans to remove and replace trees as part of Phase 2 of the Connective Corridor Project.
Tags:2013, City-County Arborist, Connective Corridor, Construction, East Fayette Street, East Genesee Street, Forman Park, Midtown, Neighborhood in Transition, Science, Stephen Harris, Syracuse, Trees
Posted in Science | No Comments »
Tuesday, January 15th, 2013
Here’s a brief conversation with illustrator/photographer/painter Anthony Washington, who installed a new mural outside the Spark Art Gallery on East Fayette Street on Monday afternoon.
Tags:2013, Anthony Washington, Art, Biotechnical Accelerator, Connective Corridor, East Fayette Street, Kennedy Square, Loguen Crossing, Midtown, Murals, Neighborhood in Transition, SIF Conversations, Spark Art Contemporary Art Space, Syracuse, Syracuse Ronald McDonald House, University Avenue 2.0
Posted in Art | No Comments »
Tuesday, December 25th, 2012
“I believe for a university to be truly world class it needs to do great, visible things in its own backyard.” Judith Rodin (former President of Penn)
Connective Corridor (East Genesee Street) Phase 1
Tags:2012, Bike Lanes, Business, Connective Corridor, East Genesee Street, Innovation, Judith Rodin, Nancy Cantor, Neighborhood in Transition, Syracuse Architectural Digest, Syracuse University
Posted in Business | 1 Comment »
Wednesday, November 28th, 2012
SUNY/ESF Biotech Accelerator, East Fayette Street.
Finishing Touches: Ronald McDonald House, University Avenue.
Tags:2012, Biotechnical Accelerator, Connective Corridor, Crowne Plaza Hotel, East Fayette Street, Kennedy Square, Loguen Crossing, Midtown, Neighborhood in Transition, Syracuse Ronald McDonald House, University Avenue 2.0
Posted in Business | No Comments »
Monday, November 12th, 2012
Bike Lane, East Genesee Street (Connective Corridor)
Tags:2012, Bike Lanes, Bike Route, Bikes, Connective Corridor, Construction, East Genesee Street, Midtown, Neighborhood in Transition, Syracuse, Transportation
Posted in Business | Comments Closed