Posts Tagged ‘Neighborhood in Transition’

Neighborhood Watch

Wednesday, September 11th, 2013

Here’s a short video from today’s Sept. 11 Ceremony at Forman Park. Last year the event was held in Firefighter’s Park a few blocks away.

Throwback Thursday: Neighborhood in Transition

Thursday, September 5th, 2013
Midtown Syracuse (circa 1990)

Midtown Syracuse (circa 1990)

Here’s a look at the old Midtown Plaza (where the Center of Excellence now stands) and the surrounding bungalows of the former Kennedy Square complex.

Chief Connection Officer (CCO)

Monday, August 19th, 2013


Here’s part two of our conversation with Linda Dickerson-Hartsock, director of the Connective Corridor. She talks about the Corridor as a social network and destination as much as a transportation route. It has literally connected some neighborhoods a stop at a time.

Under her leadership the route has the potential to become that third space (as in that place between work and home) here in the city.

Conceptual Metaphor

Monday, April 22nd, 2013
Along the Connective Corridor near Forman Park

Runners route along the Connective Corridor near Forman Park

Stop Signs

Wednesday, March 6th, 2013
New Signs (designed in Syracuse) now dot the Connective Corridor Bus Route.

New signs (designed by Syracuse students) now dot the Connective Corridor Bus Route.

Priming

Friday, January 25th, 2013

Syracuse Arborist Steve Harris discusses plans to remove and replace trees as part of Phase 2 of the Connective Corridor Project.

Neighborhood in Transition (part 20)

Tuesday, January 15th, 2013

Here’s a brief conversation with illustrator/photographer/painter Anthony Washington, who installed a new mural outside the Spark Art Gallery on East Fayette Street on Monday afternoon.

  

Year in Review (Business)

Tuesday, December 25th, 2012
“I believe for a university to be truly world class it needs to do great, visible things in its own backyard.” Judith Rodin (former President of Penn)
Connective Corridor (East Genesee Street) Phase 1

Connective Corridor (East Genesee Street) Phase 1

Neighborhood in Transition (part 19)

Wednesday, November 28th, 2012
SUNY/ESF Biotech Accelerator, East Fayette Street

SUNY/ESF Biotech Accelerator, East Fayette Street.

Finishing Touches: Ronald McDonald House, Unviersity Avenue

Finishing Touches: Ronald McDonald House, University Avenue.

Finish Line (ahead)

Monday, November 12th, 2012
Bike Lane, East Genesee Street (Connective Corridor)

Bike Lane, East Genesee Street (Connective Corridor)